Our company made underwater pump cutter head suction dredge sand machine for dredging depth 25m is self-propelled or non self-propelled, portable cutter head suction dredge. The hull uses dismantle and box-like structure, Its dismantle type can be assembly at working place easily and be transported by road, railway and container accordingly, convenient in installation and working place moving from one to another. The power system can be designed to electric system or diesel engine driving system according to customers’ requirements.
Our product is a type hydraulic controlled, assembling cutter suction dredger. It is used for river channel dredging, canal and water storage dredging. The dredging devices are driven by hydraulic, concentrate controlled. The main body of this product is made up of three pontoons, which can be assembled when dredging. The operator cabin is dismountable,which can lower the height of the dredger when maneuvering and allow the cutter head suction dredge to pass bridges. When it is transported long distance or passing not conjunctive water areas,the cutter head suction dredge body can be dismounted and transported by trucks or trains. The cutter head suction dredge can be fixed with anchor casting pole, trolley.The cutter driving device use lub oil and sealings.
JMD550D 4000M3 Underwater Pump Cutter Head Suction Dredge Sand Machine |
|||
Shijiazhuang Dredging Pump |
Dia. Discharge pipe |
550mm |
|
|
Head |
80m |
|
|
Max. Working capacity |
1050m3/h |
|
|
Discharge distance |
3500m |
|
Dredging depth |
25m |
||
Diesel Engine |
1306KW |
Cummins |
|
Hydraulic Auxiliary engine |
336KW |
Cummins |
|
Submersible pump generator |
746KW |
Cummins |
|
Emergency Generator |
30KW |
Cummins |
|
Total power |
2418KW |
||
Oil Consumption |
360L/H |
||
Hull Dismension |
L*W*D |
56m×8.5m×2.5m |
|
Hydraulic system |
Hydraulic pump |
VICKERS America(Joint-venture) |
|
|
Hydraulic Motor |
Italy SAI technology(Joint-venture) |
|
|
Valves |
REXROTH Germany(Joint-venture) |
|
|
Operating system |
SIEMENS PLC(Imported from Germany) |
|
|
Ladder winch |
Tension |
200KN |
|
Swing winch |
Tension |
120KN |
|
Cutter Head |
Crown-like |
Φ1800mm |
|
|
Power |
200KW |
Weifang Jin Meng Cutter head Suction Dredge Sand Machine Can Be Customized
1. Anchor booms installation
2. Spud carriage
3. Cutter head suction dredger position with 5 anchors.
4. Hydraulic driving for spud flat down(to pass and transport on water safely).
5. Make the cutter head suction dredge with extra dredging pump underwater to deepen dredging depth for 20-30m underwater and slurry concentration is more than 30%.
6. Make the cutter head suction dredge sand machine with booster station to further the discharge distance.
Do your cutter head suction dredge have a test before ex-factory?
Answer:Yes, it must be. Each underwater pump cutter head suction dredge sand machine for dredging depth 25m must be tested very well before ex-factory so that can guarantee cutter head suction dredge performance at customers' working sites and save the time and cost for customers. Before test we will send invitation letters to the clients to invite them come and do the performance inspection by themselves, after get the clients permission and the cutter head suction dredge will be transported to the port for loading.
How is the cutter head suction dredge sand machine transported?
Answer:There are two ways for cutter head suction dredge sand machine being transported, if the cutter head suction dredge size smaller than JMD350, it is easy to transported by containers; if the cutter head suction dredge size is larger than JMD350, it will be transported by bulks. The cutter head suction dredge structure is dismuntable and assembled so that can be easy transported by trucks on road.
What kind of service will supply after sales?
Answer:After cutter head suction dredge arrive at clients' working site, we will send two experienced engineers for cutter head suction dredge sand machine body assembly and native workers' training. With the assist of ancillary equipment like excavators and cranes , the cutter head suction dredge assembly can be finished within 10days and training can be in one week.